Search
Close this search box.

T-Liner Shorty Ambient & Steam Cure

MAIN TO LATERAL CIPP CONNECTION

the shorty

extends up to 3-10ft up lateral

t-liner system

LMK’s T-Liner® is a one-piece homogenous main and lateral CIPP connection liner. Both the mainline and lateral sections are formed as a structural cylinder that renews 18-inches and 360-degrees of the mainline and extends up the lateral pipe as one continuous lining.

air compressor

Portable Boss Bullett II Rotary Screw Air Compressor, 70 CFM rated delivery, 20hp Honda 4-cycle engine, 100 psi operating pressure rating, single stage oil flooded rotary screw, 80-115 psi operating pressure range, oil to air cooling system, 43″L x 31″ W x 35″ H. Weight 410 lbs. Equipped with 2 – 25 ft. 3/4″ air hoses

portable air reel system

Hose Reel with Rotary Fluid Passage with high torque gear reduction pneumatic auto level wind. Fixed with 500′ of high tensile 1/2″ x 1/2″ Dual Bonded Hose, all mounted on a pneumatic heavy duty cart.

  • Mounted TV Monitor
  • Portable 2000 watt Honda Generator
  • Coax Cable Reel
  • First Aid Kit/Fire Extinguisher/Eye Wash Kit mounted on the cart
  • Bottom Roller and Adjustable Top Roller

single inversion standard rope reel

Single inversion standard rope reel.

SHORTY T-LINER LAYFLAT LAUNCHER SYSTEM

layflat hose assembly

  • 10′ Layflat Assembly for up to 5′ Liners
  • 25′ Layflat Assembly for up to 20′ Liners
  • Layflat Assembly Parts: Inversion Rope, 5/16″, Kevlar, Non-stretch, Single Braid White (To create a launcher set up order length of layflat hose x 2.5 plus 5 ft.- sold in 600′ sections)
  • Clamps – 2 per end needed

steam back layflat launcher

  • Steam Back Layflat Launcher System for up to 5′ Liner Lengths. Includes Steam Back End Cone, Hose Barb, Hose and Cable, 4″ Layflat Hose, Female Camlock and D-Ring
  • Steam Back Layflat Launcher System for up to 15′ Liner Lengths. Includes Steam Back End Cone, Hose Barb, Hose and Cable, 4″ Layflat Hose, Female Camlock and D-Ring

T-LAUNCHER FOR USE WITH 5-LINE EQUIPMENT

  • 8 inch Non-Flow Thru T-Launcher with 5-Line Positioner Tab, includes male camlock and 18″ layflat hose assembly
  • 10 inch Flow Thru T-Launcher with 5-Line Positioner Tab, includes male camlock and 18″ layflat hose assembly

cleanout equipment

  • Push Plug, Cleanout, downstream, Steam “B” Station, with ½ inch flow thru, for 4″ – 6″ diameter pipes, hose and regulator assembly
  • Push Plug, Cleanout, upstream, non-flow thru, 3″ – 6″, with hose and regulator assembly

training & certification

  • License Fee per Territory (State), T-Liner
  • Training, Charge per Day, T-Liner, In-House at LMK’s Facility. Minimum 4 training days required. Trainees: Minimum 4, Maximum 8. LMK will provide all necessary training materials. Continental breakfast and lunch will also be provided. 2 Trainers
  • Training, Charge per Day, T-Liner, at Customer Location/Jobsite. Minimum 4 training days required. Trainees: minimum 4, maximum 8. Field Training must be scheduled to occur within 60 days from In-House Training. 2 Trainers
  • Travel Expenses for LMK Technicians/Trainers – Airfare (Economy or Coach) and/or Rental Car – will be added to order when travel is completed
  • (2) Travel Mobilization Time / per Trainer – Within Continental US